Email This Post Email This Post Print or Download This Post Print or Download This Post

Premix concrete production facility

Experienced industrial group has a plan to create a premixed concrete facility in Manzanillo, Colima to meet the demand for product in the area. Group seeks $1,850,000.00 USD, with a seven year recovery at 12 percent.

Send a message to this person/group:

(required)
(required)






Related posts